Abdul-Aziz, A (2001) Unraveling of BOT Scheme: Malaysia's Indah Water Konsortium. Journal of Construction Engineering and Management, 127(06), 457–60.

AbouRizk, S, Knowles, P and Hermann, U R (2001) Estimating Labor Production Rates for Industrial Construction Activities. Journal of Construction Engineering and Management, 127(06), 502–11.

Allouche, E N, Ariaratnam, S T and AbouRizk, S M (2001) Applications of Horizontal Characterization Techniques in Trenchless Construction. Journal of Construction Engineering and Management, 127(06), 476–84.

Gerber, J K and Yacoubian, G S (2001) Evaluation of Drug Testing in the Workplace: Study of the Construction Industry. Journal of Construction Engineering and Management, 127(06), 438–44.

Hegazy, T and Ersahin, T (2001) Simplified Spreadsheet Solutions. I: Subcontractor Information System. Journal of Construction Engineering and Management, 127(06), 461–8.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(461)
  • Abstract:
    This paper presents a subcontractor information system (SIS) to support the estimating and project control functions of subcontractors and small/medium-size contractors. For the proposed SIS to be simple and practical, it was developed in a spreadsheet program designed to maintain information related to resources and projects and to generate important business reports. Resource data are stored in six worksheets for labor, equipment, crews, material, subcontractors, and alternative methods of construction for various tasks. In addition, a separate worksheet is designed for each project to be used for estimating and control purposes. The latter worksheet allows the user to specify the work breakdown structure and optional methods for construction. As such, it represents a transparent estimating model that allows for quick what-if analysis regarding time and cost. In addition, the reporting worksheet provides information related to time, cost, and resource use at the individual and the multiproject levels. In a companion paper, the use of the SIS as basis for overall schedule optimization is described.

Hegazy, T and Ersahin, T (2001) Simplified Spreadsheet Solutions. II: Overall Schedule Optimization. Journal of Construction Engineering and Management, 127(06), 469–75.

Isidore, L J and Back, W E (2001) Probabilistic Optimal-Cost Scheduling. Journal of Construction Engineering and Management, 127(06), 431–7.

Lowe, D J and Skitmore, R M (2001) Human Effects in Construction Contract Price Forecasting: Experience and Experiential Learning Styles. Journal of Construction Engineering and Management, 127(06), 485–93.

Pena-Mora, F and Park, M (2001) Dynamic Planning for Fast-Tracking Building Construction Projects. Journal of Construction Engineering and Management, 127(06), 445–56.

Pheng, L S and Chuan, C J (2001) Just-in-Time Management of Precast Concrete Components. Journal of Construction Engineering and Management, 127(06), 494–501.